what is Operational Planning
The translation of venue and event operations into spatial requirements, resolving movement, access, servicing and back-of-house needs while the design can still respond.
When to involve SCA
When a venue or precinct has a design but no tested operational model. When an organising committee needs a functional brief that designers and operators can both sign up to. When an existing asset is being prepared for an event it was never designed to hold. Or when a scheme is generating expensive late changes because operational requirements arrived after the plans were fixed.
OUR APPROACH
What we contribute
Client-group definition and functional briefs stating what each group needs, where, and at what volume.
Flow and adjacency planning across arrival, screening, circulation, field of play, back-of-house, media and logistics.
Back-of-house logic and service access sized to what operations genuinely require, not to the space left over.
Coordination between design teams and operator teams, so operational assumptions are recorded rather than agreed informally.
Structured review at design stages, raising issues while they are still drawing changes instead of construction changes.
Typical outputs
Functional briefs by client group, diagrammatic flow and adjacency plans, operational design reviews, and coordination frameworks that can be handed to delivery and operations teams at the appropriate stage. [CONFIRM] Deliverable list to be confirmed against SCA's standard engagement terms.
Relevant experience
At Expo 2020 Dubai, Samantha Cotterell was Director of Design and Overlay and established the organising body's in-house Design Department, which held operational planning, visitor experience and overlay design together and produced the event operational masterplan the Expo's operations were built on. Members of the SCA team also worked to the Athens 2004 organising committee on operational and overlay design across the Olympic venues, including legacy reinstatement. [CONFIRM ROLE/CREDIT - confirm the entity and individuals for the Athens engagement, which predates the current SCA practice.]
How we help
If a venue, precinct or event programme is being designed now and operated later by someone else, that gap is where operational planning pays for itself.
QUESTIONS CLIENTS ASK US ABOUT OUR Operational Planning SERVICE
The client body and the operator carry the risk, so they benefit most directly. The requirements themselves come from everyone who uses the venue: athletes and performers, workforce, media and broadcast, officials, security, logistics and visitors. Operational planning reconciles those requirements before they collide on site.
Who is operational planning actually for?
When does operational planning need to start?
Before the plan is fixed. Client-group flows, back-of-house volumes and security lines all have spatial consequences, and retro-fitting them into a resolved design is where cost and compromise accumulate. On event programmes it should run in parallel with masterplanning.
What is operational planning in a design context?
It is the planning of how people, services, teams and event functions move through and use a venue or precinct, translated into spatial requirements the design has to meet. It is the bridge between an operations plan on paper and a building that can deliver it.
Through functional briefs, diagrammatic flow plans, documented reviews with client and operator teams, and coordination frameworks written to be handed over. The reasoning has to survive the handover, not only the drawing.
How does SCA record operational planning decisions?
In SCA's experience it reduces late change, which is where avoidable cost usually sits. Resolving movement, servicing and back-of-house requirements while the design is still fluid avoids remediation, temporary workarounds and post-event retrofit. [CONFIRM CLAIM] No independent cost benchmark is cited here; any quantified saving would need a verifiable source.
Does operational planning reduce cost?

Industry Recognition

2025
WORLD Design Awards – Gold, NEXT Futures (Expo 2030 Riyadh)
The Expo 2030 Riyadh Concept Master Plan, led by LAVA with an international consortium that includes Samantha Cotterell LLC as Expo Design Strategic Advisor, won Gold in the NEXT Futures: Vision category of the WORLD Design Awards 2025 (BETTER FUTURE Awards), recognizing projects that expand the potential of future cities.

2023
Venice Biennale - Kingdom of Saudi Arabia Pavilion - Contributing Architect
The Saudi Pavilion’s IRTH brochure profiles Samantha Cotterell’s research into salt, sand and other locally sourced materials as pathways to more sustainable architecture.

2021
AIA Gold Medal
In 2021, at an Austrade and International Chapter event held at the Australian Pavilion for Expo 2020 Dubai, Samantha Cotterell was awarded a Gold Medal by Justin McGowan, Australia's Commissioner-General for Expo 2020, recognizing her work promoting architecture as a key export in the Middle East and Africa region.

2020
Fellow of the Australian Institute of Architects
In 2020, Samantha Cotterell was named a Fellow of the Australian Institute of Architects, an honour given to members who have demonstrated a significant contribution to the architecture profession beyond practice.

2015
International Architectural Design Competition and Project Award
In 2015, Samantha Cotterell led DESIGNSPORT to win the International Architectural Design Competition and Project Award for the Qatar 2022 World Cup Stadium in Precinct 5, delivered for and with the Arab Engineering Bureau, Qatar.

2011
Australian Event Awards — Finalist
In 2011, Samantha's company DESIGNSPORT became a finalist in two categories at the Australian Event Awards, including 'Best Export' and 'Best Product/Service.'
As Seen In
RELAtED WORK





